Challenger - Discovery Loop Trail Improvements *Dates TBD*

Dates TBD

Bonfils Stanton Trailhead, US 40, Winter Park, CO 80482

HTA is collaborating with WP Resort to provide critical improvements to the adaptive trail loop near the base of the resort. Phase one of this project will entail minor handrail repairs, a turnpike replacement, down and hazard tree mitigation, and the installation of flooding control pipes to alleviate beaver dam issues in the area. Phase two will involve replacing the accessible boardwalks a few years down the line. Volunteers are needed to haul turnpike materials, help with the installation of flooding control pipes, and overall assistance with the removal of down and hazard trees. Please email [email protected] if you are interested in joining this effort. *Project Dates are TBD*